Visas kategorijas
EN

Nozares jaunumi

Sākums>UZZINI VAIRĀK>Nozares jaunumi

Integrēto MBR notekūdeņu attīrīšanas iekārtu projektēšanas principi

Laiks: 2020-02-18 Apskatīts: 9

The following introduces the design principles of integrated sewage treatment equipment, I hope to help everyone:
1. According to local conditions, construct a beautiful sewage treatment on the existing site and coordinate with Zhou Wei building;
2. Strictly implement the national regulations on environmental protection and ensure that the discharged water index meets the national and local Contaminants discharge specifications;
3. Adopt the current domestic perfect and practical processing technology to achieve the goal of governance smoothly and steadily;
4. Under the above prerequisites and requirements, achieve less investment and low operating expenses;
5. The technical route is simple and clear, and the operation and management are convenient.